REPORT/RECOMMENDATION TO THE BOARD OF SUPERVISORS

OF SAN BERNARDINO COUNTY

AND RECORD OF ACTION

 

October 21, 2025

 

FROM

DON DAY, Director, Project and Facilities Management Department

         

SUBJECT                      

Title                     

Amendment to Contract with Trane U.S., Inc. dba Southern California Trane for Chiller and Heating, Ventilation, Air Conditioning Maintenance and Unforeseen Repair Services 

End

 

RECOMMENDATION(S)

Recommendation

Approve Amendment No. 1 to Contract No. 23-1237 with Trane U.S., Inc. dba Southern       California Trane to provide additional chiller and heating, ventilation, air conditioning preventative maintenance and repair services for existing locations and six additional locations, increasing the contract amount by $572,591, from $2,323,475 to $2,896,066, with no change to the contract term of December 1, 2023 through November 30, 2028.

(Presenter: Don Day, Director, 387-5000)

Body

 

COUNTY AND CHIEF EXECUTIVE OFFICER GOALS & OBJECTIVES

Promote the Countywide Vision.

Operate in a Fiscally-Responsible and Business-Like Manner.

 

FINANCIAL IMPACT

Approval of this item will not require additional Discretionary General Funding (Net County Cost).  The cost for additional maintenance and repair services at some existing locations and for six additional locations will increase the contract by $572,591, which includes a not-to-exceed amount of $75,000 for unforeseen repairs. The contract includes a base amount, which is increasing upon approval of Amendment No. 1, for routine maintenance services, and an additional amount to cover unforeseen repairs, which are detailed in the table below. Payments for services provided under this contract will be made from the Facilities Management Division (FMD) budget (7302001000). Sufficient appropriation is included in the FMD 2025-26 budget and will be included in future recommended budgets. The annual contract costs are as follows:

 

Fiscal Year

Original Annual Cost

Amendment No. 1

Total Annual Cost

2023-24

$183,572

-

$183,572

2024-25

$314,695

-

$314,695

2025-26

$314,695

         $96,754

$411,449

2026-27

$314,695

         $165,864

$480,559

2027-28

$314,695

         $165,864

$480,559

2028-29

$131,123

          $69,109

$200,232

Unforeseen Repairs

$750,000

$75,000

$825,000

Total Cost

$2,323,475

$572,591

$2,896,066

 

Costs for preventative maintenance and repairs are included in maintenance charges reimbursed by County department occupants. These charges are either based on an average cost per square foot or billed as requisition work to County departments for facilities not charged on a per square foot cost for maintenance.

 

BACKGROUND INFORMATION

Many large buildings or campuses in the County’s real estate portfolio use chilled water systems to provide air conditioning to the spaces.  These chilled water systems utilize machines known as chillers to refrigerate water that is then circulated via pumps through a series of coils designed to control space temperatures and provide comfort cooling.  This item provides for preventative maintenance service on additional chiller/ Heating, Ventilation, Air Conditioning (HVAC) equipment at existing locations and at six new County-owned buildings. 

 

On November 14, 2023 (Item No. 52), the Board of Supervisors approved a non-competitive Contract No. 23-1237 with Trane U.S., Inc., dba Southern California Trane (Trane), in an amount not to exceed $2,323,475, including a base amount of $1,573,475 for routine preventative maintenance, and an amount not to exceed $750,000 for unforeseen repair services at 22 County-owned locations for the period of December 1, 2023 through November 30, 2028.

 

Approval of Amendment No. 1 to Contract No. 23-1237 with Trane will provide additional preventative maintenance services on chiller/HVAC equipment at existing locations and at the following additional County-owned locations which are either new buildings brought into the County-maintained system or services provided on previously non-contracted existing locations:    

 

                     Innovation Technology Department (ITD) location at 670 E. Gilbert St., San Bernardino

                     ITD location at 851 Cooley Dr., Colton

                     Glen Helen Rehabilitation Administration - 18000 W. Institution Rd., Devore

                     Public Health - 451 Vanderbilt Way, San Bernardino

                     Sheriff Headquarters - 655 E. 3rd St., San Bernardino

                     High Desert Government Center - 15900 Smoke Tree St., San Bernardino

 

PROCUREMENT

N/A

 

REVIEW BY OTHERS

This item has been reviewed by County Counsel (Kaleigh Ragon, Deputy County Counsel, 387-5455) on September 24, 2025; Project and Facilities Management (Jennifer Costa, Chief of Facilities Management, 387-2920) on September 29, 2025; and County Finance and Administration (Edwardo Mora, Administrative Analyst, 387-4376) on October 2, 2025.