Subject: Plans and Specifications for the Park Drive and Other Roads Project in the Wrightwood Area
Attachments: 1. ATT-PW-Trans 5-9-23 Plans and Specs for Park Drive and Other Roads Project, Wrightwood Area - Specs 1 of 2, 2. ATT-PW-Trans 5-9-23 Plans and Specs for Park Drive and Other Roads Project, Wrightwood Area - Specs 2 of 2, 3. MAP-PW-Trans 5-9-23 Plans and Specs for Park Drive and Other Roads Project, Wrightwood Area, 4. ATT-PW-Trans 5-9-23 Plans and Specs for Park Drive and Other Roads Project, Wrightwood Area - Plans, 5. Item #40 Executed BAI

REPORT/RECOMMENDATION TO THE BOARD OF SUPERVISORS

OF SAN BERNARDINO COUNTY

AND RECORD OF ACTION

 

May 9, 2023

 

FROM

BRENDON BIGGS, Director, Department of Public Works - Transportation

 

SUBJECT

Title

Plans and Specifications for the Park Drive and Other Roads Project in the Wrightwood Area

End

 

RECOMMENDATION(S)

Recommendation

1.                     Approve the plans and specifications for the Park Drive and Other Roads Project in the Wrightwood area, as signed and sealed by a registered civil engineer.

2.                     Authorize the Director of the Department of Public Works to advertise the Park Drive and Other Roads Project in the Wrightwood area for formal bids.

 (Presenter: Brendon Biggs, Director, 387-7906)

Body

 

COUNTY AND CHIEF EXECUTIVE OFFICER GOALS & OBJECTIVES

Ensure Development of a Well-Planned, Balanced, and Sustainable County.

Provide for the Safety, Health and Social Service Needs of County Residents.

 

FINANCIAL IMPACT

Approval of this item will not result in the use of Discretionary General Funding (Net County Cost). The Park Drive and Other Roads Project in the Wrightwood Area (Project) will be funded with Senate Bill 1 (SB1) Road Maintenance and Rehabilitation Account (RMRA) funds. Sufficient appropriation and revenue are included in the Department of Public Works (Department) 2022-23 Road Operations budget (66500002000 34H15113) and will be included in future recommended budgets.

 

BACKGROUND INFORMATION

The Project involves approximately 0.35 miles of pavement rehabilitation and reconstruction on Park Drive, pavement rehabilitation on Apple Avenue and Evergreen Road, constructing new curb ramps in accordance with current design standards and pursuant to the Americans with Disabilities Act (ADA) guidelines, constructing sidewalks, curb and gutters at various locations and constructing a new concrete drainage swale.  Minimal work for the project will be done outside of existing right-of-way and will require permission from property owners; however, no acquisitions will be required.  

 

The Project was prioritized by the Board of Supervisors (Board) as part of the 2019-20 SB 1 RMRA project list approved on April 21, 2020 (Item No. 45). Updating of existing ADA compliant curb ramps or installation of new ADA compliant curb ramps in the Project area are required for the subject road improvements under the federal “2013 Department of Justice/Department of Transportation Joint Technical Assistance on the Title II of the ADA Requirements to Provide Curb Ramps when Streets, Roads, or Highways are Altered through Resurfacing” guidelines.

 

On January 10, 2023 (Item No. 37), the Board determined the Project was exempt under the California Environmental Quality Act, approved the Project as defined in the Notice of Exemption, and directed the Clerk of the Board to file and post said notice.

 

The Project aligns with the County and the Chief Executive Officer’s goals and objectives of ensuring development of a well-planned, balanced and sustainable County by preserving and improving the structural integrity of existing road surfaces and access for pedestrians, including those with disabilities.

 

PROCUREMENT

The Project will be advertised to invite formal bids in accordance with Section 22037 of the California Public Contract Code. The Department anticipates returning to the Board for an award of the construction contract in Summer 2023.

 

REVIEW BY OTHERS

This item has been reviewed by County Counsel (Aaron Gest, Deputy County Counsel, 387-5455) on April 11, 2023; Finance (Carl Lofton, Administrative Analyst, 387-5404) on April 24, 2023; and County Finance and Administration (Paloma Hernandez-Barker, Deputy Executive Officer, 387-5423) on April 24, 2023.