REPORT/RECOMMENDATION TO THE BOARD OF SUPERVISORS
OF THE COUNTY OF SAN BERNARDINO
AND RECORD OF ACTION
October 24, 2023
FROM
BRENDON BIGGS, Director, Department of Public Works - Transportation
SUBJECT
Title
Contract with Dokken Engineering to Provide Professional Engineering and Environmental Services for the Replacement of Bridges on the National Trails Highway in the Amboy and Ludlow Areas
End
RECOMMENDATION(S)
Recommendation
Approve Contract with Dokken Engineering, in the amount not-to-exceed $5,780,013, for the period of October 24, 2023 through October 24, 2028, to provide professional engineering and environmental services for the replacement of 19 bridges on National Trails Highway, in the Amboy and Ludlow areas.
(Presenter: Brendon Biggs, Director, 387-7906)
Body
COUNTY AND CHIEF EXECUTIVE OFFICER GOALS & OBJECTIVES
Operate in a Fiscally-Responsible and Business-Like Manner.
Ensure Development of a Well-Planned, Balanced, and Sustainable County.
Provide for the Safety, Health and Social Service Needs of County Residents.
FINANCIAL IMPACT
Approval of this item will not result in the use of additional Discretionary General Funding (Net County Cost). The replacement of 19 Bridges on National Trails Highway in the Amboy and Ludlow Areas (Project) is a federal Highway Bridge Program (HBP) funded project. Discretionary General Funding allocated to the Department specifically for use on National Trails Highway bridges is being used to provide for the Project costs under California Department of Transportation’s (Caltrans) Local Advance Construction Authorization. Caltrans’ Local Advance Construction Authorization provides a process for pre-authorization to commence with the preliminary engineering phase, which includes hiring a consultant, with the anticipation of reimbursement from Caltrans once funds are available. Sufficient appropriation and revenue are included in the Department’s 2023-24 Road Operations budget (6650002000 12H15133-35, 12H15137-52), and will be included in future recommended budgets.
BACKGROUND INFORMATION
The Project involves the replacement of 19 bridges (Borada Ditch, Atajo Ditch, Ellita Ditch, Tenino Ditch, Cota Ditch, Danby Ditch, Dalmatia Ditch, Tareco Ditch, Ava Ditch, Izzy Ditch, Califa Ditch, Elrita Ditch, Clipper Ditch, Axton Ditch, Edloft Ditch, Bandera Ditch, Terzilla Ditch, Kalmia Ditch, and Nicola Ditch) on the National Trails Highway. These are 19 of the 133 bridges on the National Trails Highway constructed in 1929-1930, which are in need of replacement. The new bridges will be designed to accommodate legal load weight limits and a 100-year storm event.
According to the terms of the contract, Dokken Engineering (Dokken) will provide the following professional engineering and environmental services/deliverables associated with the Project:
(1) Project management
(2) 35% civil plans (completion to 35% of final plans)
(3) 35% bridge design (completion to 35% of final design)
(4) Right-of-way engineering support
(5) Hydrology/hydraulics
(6) Geotechnical investigations and reports
(7) Utility coordination
(8) Survey (optional task)
(9) Railroad coordination
(10) Environmental compliance documents and reports
(11) Cultural resources compliance
(12) Permitting (geotechnical)
(13) Civil design and specifications
(14) Bridge design and specifications
(15) Quantities and Plans, Specifications and Estimate (PS&E)
(16) Storm Water Pollution Prevention Plan (SWPPP)
(17) Permits
The following optional tasks may also be exercised upon receipt of HBP construction funding:
(18) Bid support
(19) Construction support
On June 8, 2021 (Item No. 69), the Board authorized the Department to request approval to begin the Project under the Local Advance Construction Authorization. Under this authorization, local agencies pay project preliminary engineering phase costs until HBP funds become available. The contract with Dokken includes 17 tasks for an estimated amount of $5,428,645, which is funded with HBP funding at 80% ($4,342,916) and the County match of 20% ($1,085,729). The contract also includes two optional tasks, referenced above, in the amount of $351,368, which are in addition to the $5,428,645 of the Contract amount for tasks 1-17, resulting in a total contract not-to-exceed amount of $5,780,013.
The Project will meet the County and the Chief Executive Officer’s goals and objectives of ensuring the development of a well-planned, balanced and sustainable county and providing for the safety, health and social service needs of county residents by replacing those bridges in need of structural improvements. Through diligent contract negotiations for a fair and reasonable cost, the County is also operating in a fiscally-responsible and business-like manner.
PROCUREMENT
Request for Proposal (RFP) No. PWG122-TRANS-4581 for Professional Engineering and Environmental Services for Bridge Replacement on National Trails Highway at 19 Bridges was released through the County Electronic Procurement Network (e-Pro) on June 27, 2022. On July 27, 2022, three proposals were received and accepted for review:
|
Consultant |
Location |
|
Dokken Engineering |
Folsom, CA |
|
EXP U.S. Services, Inc. |
San Bernardino, CA |
|
Kimley-Horn and Associates, Inc. |
Riverside, CA |
The proposals were evaluated by a selection committee made up of three members from the Department’s Transportation Design, Contracts, and Environmental Management Divisions, and one team member from Caltrans District 8. The selection committee determined that Dokken was the most qualified consultant based on its understanding of the work to be done, experience with similar type of work, familiarity with state and federal procedures, demonstrated technical ability and understanding of the County’s needs and immediate availability of staff.
After ranking the firms, the highest ranked firm’s cost proposal was opened in accordance with Caltrans Local Assistance Procedures Manual since federal HBP funds will be used for both design and construction of the Project. In accordance with Caltrans’ policy, contract negotiations were conducted with the firm that ranked the highest to determine a fair and reasonable cost for the scope of work. Staff from the Transportation Design Division and Dokken representatives subsequently agreed to the amount of $5,780,013, including Final PS&E and bid support, and construction support, which are optional tasks. No appeal and or protest letters were received.
Construction support is included in the contract’s scope of services as an optional task because it is not funded at this time. Upon approval by Caltrans and issuance of an authorization to proceed with construction, the Department may award the optional tasks.
REVIEW BY OTHERS
This item has been reviewed by County Counsel (Aaron Gest, Deputy County Counsel, 387-5455) on September 22, 2023; Purchasing (Jason Cloninger, Lead Buyer, 387-8258) on September 27, 2023; Finance (Carl Lofton, Administrative Analyst, 387-5404) on October 4, 2023; and County Finance and Administration (Paloma Hernandez-Barker, Deputy Executive Officer, 387-5423) on October 10, 2023.