Legislation Details

File #: 8438   
Type: Consent Status: Passed
File created: 7/14/2023 Department: Public Works-Transportation
On agenda: 7/25/2023 Final action: 7/25/2023
Subject: California Environmental Quality Act Finding, Plans and Specification for the Saw Mill Drive Drainage Improvements Project in the Big Bear City Area
Attachments: 1. ATT-PW-Trans 7-25-23 CEQA, Plans, and Specs for Saw Mill Drive Drainage Project, Big Bear City Area - Plans, 2. ATT-PW-Trans 7-25-23 CEQA, Plans, and Specs for Saw Mill Drive Drainage Project, Big Bear City Area - Specs, 3. MAP-PW-Trans 7-25-23 CEQA, Plans, and Specs for Saw Mill Drive Drainage Project, Big Bear City Area, 4. ATT-PW-Trans 7-25-23 CEQA, Plans, and Specs for Saw Mill Drive Drainage Project, Big Bear City Area - NOE, 5. Item #50 Executed BAI

REPORT/RECOMMENDATION TO THE BOARD OF SUPERVISORS

OF SAN BERNARDINO COUNTY

AND RECORD OF ACTION

 

July 25, 2023

 

FROM

BRENDON BIGGS, Director, Department of Public Works - Transportation

 

SUBJECT

Title

California Environmental Quality Act Finding, Plans and Specification for the Saw Mill Drive Drainage Improvements Project in the Big Bear City Area

End

 

RECOMMENDATION(S)

Recommendation

1.                     Find that the Saw Mill Drive Drainage Improvements Project in the Big Bear City area is exempt under the California Environmental Quality Act Guidelines, Title 14 of the California Code of Regulations Section 15301(c) Class 1 (existing facilities) and Section 15302(c) Class 2 (replacement or reconstruction).

2.                     Approve the Saw Mill Drive Drainage Improvements Project in the Big Bear City area as defined in the Notice of Exemption.

3.                     Approve the plans and specifications for the Saw Mill Drive Drainage Improvements Project in the Big Bear City area, as signed and sealed by a registered civil engineer.

4.                     Authorize the Director of the Department of Public Works to advertise the Saw Mill Drive Drainage Improvements Project in the Big Bear City area for formal bids.

5.                     Direct the Clerk of the Board of Supervisors to file and post the Notice of Exemption.

(Presenter: Brendon Biggs, Director, 387-7906)

Body

 

COUNTY AND CHIEF EXECUTIVE OFFICER GOALS & OBJECTIVES

Ensure Development of a Well-Planned, Balanced, and Sustainable County.

Provide for the Safety, Health and Social Service Needs of County Residents.

 

FINANCIAL IMPACT

Approval of this item will not result in the use of Discretionary General Funding (Net County Cost). The Saw Mill Drive Drainage Improvements Project in the Big Bear City area (Project) will be funded with Gas Tax funds. Sufficient appropriation and revenue are included in the Department of Public Works (Department) 2023-24 Road Operations budget (66500002000 34H15069) and will be included in future recommended budgets.

 

BACKGROUND INFORMATION

The Project’s limits are Saw Mill Drive, from Rainbow Boulevard north to State Highway 18 and involve replacing an existing storm drain, constructing a new concrete box culvert, concrete channel, headwalls, curb and gutter, and asphalt concrete and base, removing a small portion of asphalt pavement, removing and installing chain link fence, installing traffic striping and signs, and utility relocation. Minimal work for the Project will be done outside of existing right-of-way and will require permission from property owners; however, no acquisitions will be required.

 

Due to the narrow width of Saw Mill Drive, and in the interest of public and worker safety, the Department will close the Project to through traffic for approximately eight weeks. Convenient access to property owners adjacent to the Project and emergency vehicles will be provided. Public traffic will be routed around the construction site on public streets. Appropriate measures will be taken to notify surrounding schools, businesses and residences of the road closure and detour.

 

The Department’s environmental staff has reviewed this Project and determined that a categorical exemption in accordance with the California Environmental Quality Act (CEQA) Guidelines, Title 14 of the California Code of Regulations, Section 15301(c) Class 1 and Section 15302(c) Class 2 is appropriate.  The Class 1 exemption allows for repair and maintenance activities on existing roads, sidewalks, gutters, and similar facilities that involve negligible or no expansion of use beyond that existing at the time of the lead agency’s determination. The Class 2 exemption allows for the replacement or reconstruction of existing structures and facilities where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced. When the Board of Supervisors (Board) considers the environmental finding, the filing and posting of a Notice of Exemption is recommended.

 

The Project aligns with the County and the Chief Executive Officer’s goals and objectives of ensuring development of a well-planned, balanced and sustainable County and providing for the safety of County residents by performing road maintenance and drainage improvements before a major storm event occurs.

 

The Project’s specifications include an allowance in the amount of $60,000 for unforeseen differing site conditions associated with utility conflicts and/or soil conditions.

 

PROCUREMENT

The Project will be advertised in accordance with Section 22037 of the California Public Contract code.  The Department anticipates returning to the Board for an award of the construction contract in Summer 2023.

 

REVIEW BY OTHERS

This item has been reviewed by County Counsel (Aaron Gest, Deputy County Counsel, 387-5455) on July 11, 2023; Finance (Carl Lofton, Administrative Analyst, 387-5404) on July 7, 2023; and County Finance and Administration (Paloma Hernandez-Barker, Deputy Executive Officer, 387-5423) on July 7, 2023.