REPORT/RECOMMENDATION TO THE BOARD OF SUPERVISORS
OF SAN BERNARDINO COUNTY
AND RECORD OF ACTION
July 25, 2023
FROM
BRENDON BIGGS, Director, Department of Public Works - Solid Waste Management
SUBJECT
Title
Plans and Specifications for the Unit 2 Phase 5 Composite Liner Construction Project at the San Timoteo Sanitary Landfill
End
RECOMMENDATION(S)
Recommendation
1. Approve the plans and specifications for the Unit 2 Phase 5 Composite Liner Construction Project at the San Timoteo Sanitary Landfill, as signed and sealed by a registered civil engineer.
2. Authorize the Director of the Department of Public Works to advertise the Unit 2 Phase 5 Composite Liner Construction Project at the San Timoteo Sanitary Landfill for formal bids.
(Presenter: Brendon Biggs, Director, 387-7906)
Body
COUNTY AND CHIEF EXECUTIVE OFFICER GOALS & OBJECTIVES
Provide for the Safety, Health and Social Service Needs of County Residents.
FINANCIAL IMPACT
Approval of this item will not result in the use of Discretionary General Funding (Net County Cost). The Unit 2 Phase 5 Composite Liner Construction Project at the San Timoteo Sanitary Landfill (Project) will be funded by fee revenue as the Department of Public Works - Solid Waste Management Division (SWMD) establishes fees that are charged to the public and other agencies for utilization of the County’s Waste Disposal System. Sufficient appropriation and revenue are included in the SWMD 2023-24 budget and will be included in future recommended budgets.
BACKGROUND INFORMATION
The San Timoteo Sanitary Landfill (STSL) is located in the City of Redlands at 31 Refuse Road and has been accepting municipal solid waste from various cities within San Bernardino County (County) since operations at the site commenced in 1980. The site occupies approximately 366 acres of which 114 are permitted for refuse disposal. The site consists of two waste management units with the Project occupying a portion of the second unit. The current rate of trash disposal at the site necessitates the construction of additional liner to provide the operator with additional capacity.
The Project includes excavation and grading to support the construction of 26 acres of regulatory agency approved single composite geo-membrane liner, reconfiguration of a stormwater retention basin on the northwest side of Unit 2, and construction of a perimeter access and haul road.
The Environmental Management Division of the Department of Public Works has completed a California Environmental Quality Act (CEQA) review of the proposed Project. The current proposed liner Project has been previously analyzed under existing CEQA documents. Previous environmental documentation at the STSL includes:
• 1995 - Solid Waste Facilities Permit Update (Mitigated Negative Declaration)
• 1997 - Construction of a Landfill Liner System (Mitigated Negative Declaration)
• 1998 - Board adopted Mitigated Negative Declaration for Potential Environmental Impacts for Future Liner Construction
• 1998 - Drainage Improvements to Improve On-Site/Off-Site Drainage Conditions (Categorical Exemption)
• 1999 - Alternative Cover Material for County-operated landfills (Categorical Exemption)
• 2002 - Solid Waste Facilities Permit Update (Mitigated Negative Declaration)
• 2005 - Minor Modification to the Initial Study Project Description (1998 Mitigated Negative Declaration Addendum)
• 2012 - STSL 5-Year permit Review (Mitigated Negative Declaration)
In 1998, a Mitigated Negative Declaration (MND) was adopted by the Board of Supervisors (Board) for the specific purpose of reviewing potential environmental impacts resulting from the construction of a liner system at the existing STSL. The 1998 MND describes that the proposed liner system is a requirement of the 1995 Solid Waste Facilities Permit, which imposed new regulatory requirements on sanitary landfills like the STSL. The 1998 project proposed to split Cell No. 3 into two phases [Phase (cell) 4 and 5]. Phases 4 and 5 make up part of the previously identified Cell No. 3 area. Other than these changes, no changes to the physical site are proposed that have not been previously analyzed in existing CEQA documents.
The 2005 minor modification to the project description in the Initial Study was supported by a Biological Site Evaluation (BSE). This BSE reviewed numerous previous studies of the STSL from 1995 to 2004, included a current site survey and concluded that no sensitive or listed plant or wildlife species of habitat will be indirectly or directly affected by the expansion of the landfill at the edges into previously undisturbed and disturbed areas.
The 2012 MND primarily addressed site life and maximum daily vehicle and tonnage Solid Waste Facility Permit revisions without discussion of the Project.
Based upon the STSL CEQA documentation in total, it is concluded that the existing CEQA analyses prepared for the STSL, including adherence to the existing mitigation measures is sufficient and no additional CEQA analysis is required.
This item supports the County and the Chief Executive Officer’s goals and objectives of providing for the safety, health, and social service needs of County residents by operating in a responsible manner to provide continued disposal services.
PROCUREMENT
The Project will be advertised to invite formal bids in accordance with Section 22037 of the California Public Contract Code. SWMD anticipates returning to the Board for an award of the construction contract in October 2023.
REVIEW BY OTHERS
This item has been reviewed by County Counsel (Aaron Gest, Deputy County Counsel, 387-5455) on June 8, 2023; Finance (Carl Lofton, Administrative Analyst, 387-5404) on July 7, 2023; and County Finance and Administration (Paloma Hernandez-Barker, Deputy Executive Officer, 387-5423) on July 7, 2023.