REPORT/RECOMMENDATION TO THE BOARD OF SUPERVISORS
OF THE SAN BERNARDINO COUNTY FLOOD CONTROL DISTRICT
AND RECORD OF ACTION
July 23, 2019
FROM
KEVIN BLAKESLEE, Chief Flood Control Engineer, Flood Control District
SUBJECT
Title
Plans and Specifications for Construction of the Etiwanda Channel Invert Repair Project
End
RECOMMENDATION(S)
Recommendation
Acting as the governing body of the San Bernardino County Flood Control District (District):
1. Approve the plans and specifications for construction of the Etiwanda Channel Invert Repair Project, in the City of Fontana (Project), as signed and sealed by a registered civil engineer.
2. Authorize the Chief Flood Control Engineer of the District to advertise the Project for bids.
(Presenter: Kevin Blakeslee, Chief Flood Control Engineer, 387-7906)
Body
COUNTY AND CHIEF EXECUTIVE OFFICER GOALS & OBJECTIVES
Ensure Development of a Well-Planned, Balanced, and Sustainable County.
Provide for the Safety, Health and Social Service Needs of County Residents.
FINANCIAL IMPACT
Approval of this will not result in the use of Discretionary General Funding (Net County Cost.) The District is funded by property taxes, fees, local, state, and federal funding. Sufficient appropriation and revenue have been included in the District’s 2019-20 budget (1910002518-F02615) and will be included in future recommended budgets.
BACKGROUND INFORMATION
This Project is needed to repair approximately 1.9 miles of the invert due to erosion, which has led to exposed steel reinforcement. The work will consist of concrete overlay or thermoset vinyl polymer overlay. No work is proposed outside of the channel. The Project is located in the City of Fontana, between South West Liberty Parkway and Interstate 210. All work for this Project will be performed within existing District right-of-way and no additional right-of-way will be acquired.
A Notice of Exemption for maintenance activities within the channel was filed October of 2016 with the Clerk of the Board. It has been determined the activities, as described above, fall under this exemption for maintenance. Additionally, the District has a California Department of Fish and Wildlife Section 1602 “Operation by Law” Permit, which allows for maintenance of the channel. The District has received a letter from U.S. Army Corp of Engineers, and concurrence from the Regional Water Quality Control Board, stating no permits are required for maintenance within concrete lined channels.
This Project aligns with the District’s 10-year plan by ensuring that the structural integrity of the Etiwanda Channel maintains flood protection capacity and the specifications include all regulatory permits to construct the Project.
PROCUREMENT
The Project will be advertised for bids in accordance with Section 22037 of the California Public Contract Code. The District anticipates returning to the Board of Supervisors for an award of the contract in September 2019.
REVIEW BY OTHERS
This item has been reviewed by County Counsel (Sophie A. Akins, Deputy County Counsel, 387-5455) on June 11, 2019; Finance (Wen Mai, Administrative Analyst, 387-4020) on June 28, 2019; and County Finance and Administration (Matthew Erickson, County Chief Financial Officer, 387-5423) on July 5, 2019.