Legislation Details

File #: 7555   
Type: Consent Status: Passed
File created: 2/17/2023 Department: Public Works-Special Districts
On agenda: 2/28/2023 Final action: 2/28/2023
Subject: Construction Contract for Glen Helen Small Bridge Project in the San Bernardino Area
Attachments: 1. R1-CON-PW-022823 Glen Helen Small Bridge Project, 2. ADD-ATT-PW-022823 Glen Helen Small Bridge Project Addendum No. 1, 3. ADD-ATT-PW-022823 Glen Helen Small Bridge Project Addendum No. 2, 4. Item #51 Executed BAI, 5. 23-162 Executed Contract

REPORT/RECOMMENDATION TO THE BOARD OF SUPERVISORS

OF SAN BERNARDINO COUNTY

AND RECORD OF ACTION

 

                                          February 28, 2023

 

FROM

BRENDON BIGGS, Director, Department of Public Works - Special Districts 

BEAHTA R. DAVIS, Director, Regional Parks Department 

         

SUBJECT                      

Title                     

Construction Contract for Glen Helen Small Bridge Project in the San Bernardino Area

End

 

RECOMMENDATION(S)

Recommendation

1.                     Approve Addendum No. 1, issued on January 4, 2023, and Addendum No. 2, issued on January 19, 2023, to the bid documents for the Glen Helen Small Bridge Project in the San Bernardino area.

2.                     Award a construction contract to R.E. Schultz Construction, Inc. in the amount of $389,690 for the Glen Helen Small Bridge Project in the San Bernardino area.

3.                     Authorize the Director of the Department of Public Works to approve necessary changes or additions to the work performed under the construction contract for a total amount not to exceed $31,984 pursuant to Public Contract Code section 20142.

4.                     Authorize the Director of the Department of Public Works to accept the work when 100% complete, execute and file the Notice of Completion. 

(Presenter: Brendon Biggs, Director, 387-7906)

Body

 

COUNTY AND CHIEF EXECUTIVE OFFICER GOALS & OBJECTIVES

Operate in a Fiscally-Responsible and Business-Like Manner.

Ensure Development of a Well-Planned, Balanced, and Sustainable County.

Provide for the Safety, Health and Social Service Needs of County Residents.

 

FINANCIAL IMPACT

Approval of this item will not result in the use of Discretionary General Funding (Net County Cost). The Glen Helen Small Bridge Project (Project) will be funded by the Proposition 68 Per Capita grant.  This grant was issued by the California Department of Parks and Recreation Office of Grants and Local Services to the Regional Parks Department (Regional Parks). Sufficient appropriation and revenue for the Project are included in Regional Parks’ 2022-23 budget and will be included in future recommended budgets.

 

BACKGROUND INFORMATION

The Project involves demolishing and disposing of the existing wood bridge at Glen Helen Regional Park and replacing it with a steel structure prefabricated bridge, as well as repairing and painting a smaller bridge. The bridges, which are located inside Glen Helen Regional Park, are needed for pedestrian and maintenance vehicle access to the existing structures at the center of the large fishing lake.

 

The existing wood bridge has deteriorated to a point where the structural integrity has been compromised and a complete replacement is required to allow for maintenance vehicles to safely access the existing structures. The smaller bridge, which primarily serves pedestrians, is still stable and only requires cosmetic updates. There will be no expansion of use and all work will be completed within the existing property.

 

On December 6, 2022 (Item No. 39), the Board of Supervisors (Board) determined the Project was exempt under the California Environmental Quality Act and directed the Clerk of the Board to file and post said notice.

 

PROCUREMENT

On December 6, 2022 (Item No. 39), the Board approved the Project’s plans and specifications and authorized the Director of the Department of Public Works (Department) to advertise the Project for bids. On December 8, 2022, the Department advertised for bids through the County Electronic Procurement Network (ePro) website in accordance with Public Contract Code Section 22037.  On January 11, 2023, a total of 10 contractors attended a mandatory pre-bid site meeting and on January 31, 2023, the following bids were received:

 

Contractor Name

Total Bid Amount

R.E. Shultz Construction, Inc.

$389,690

S. Porter Inc.

$423,619

Three Peaks Corp.

$438,021

Leonida Builders, Inc.

$498,000

Beador Construction

$526,700

 

The following addendums were issued during the bidding phase:

 

Addendum No. 1: Schedule Changes.

Addendum No. 2: Schedule Changes, Abutment Requirements and Questions/Responses.

 

The Department reviewed the bids received, determined that the bids were responsive, and recommends an award of construction contract to R.E. Schultz Construction, Inc. as the lowest responsible bidder. No appeal/protest letters have been received.

 

Under an established formula based on the contract amount of $389,690, Public Contract Code section 20142 allows the Board to authorize the Director of Public Works to order changes in the contract, including for unforeseen conditions or design shortfalls, should they become necessary in the future, for a total amount not to exceed $31,984.

 

Upon Board approval, construction is anticipated to commence in March 2023 and be completed by December 2023.

 

REVIEW BY OTHERS

This item has been reviewed by County Counsel (Aaron Gest, Deputy County Counsel, and Suzanne Bryant, Deputy County Counsel, 387-5455) on February 2, 2023; Purchasing (Bruce Cole, Supervising Buyer, 387-2148) on February 2, 2023; Finance (Tom Forster, Administrative Analyst, 387-4635, and Elias Duenas, Administrative Analyst, 387-4052) on February 6, 2023; and County Finance and Administration (Paloma Hernandez-Barker, Deputy Executive Officer, 387-5423) on February 11, 2023.