File #: 3433   
Type: Consent Status: Passed
File created: 12/21/2020 Department: San Bernardino County Flood Control District
On agenda: 1/5/2021 Final action: 1/5/2021
Subject: Amendment to Local Cooperation Agreement with the United States Army Corps of Engineers, Orange County Flood Control District, and Riverside County Flood Control and Water Conservation District for the Santa Ana River Mainstem Project
Attachments: 1. AGR-FCD 1-5-21 Amend Local Coop Agr with Corps of Engineers, Orange County, and Riverside County, 2. ATT-FCD 1-5-21 Amend Local Coop Agr with Corps of Engineers, Orange County, and Riverside County - Addendum, 3. ATT-FCD 1-5-21 Amend Local Coop Agr with Corps of Engineers, Orange County, and Riverside County - Cert of Authority, 4. ATT-FCD 1-5-21 Amend Local Coop Agr with Corps of Engineers, Orange County, and Riverside County - Lobbying Cert, 5. ATT-FCD 1-5-21 Amend Local Coop Agr with Corps of Engineers, Orange County, and Riverside County - Signed Certs, 6. COV-FCD 1-5-21 Amend Local Coop Agr with Corps of Engineers, Orange County, and Riverside County, 7. Item #44 Executed BAI, 8. 89-1087-A-1 Unexecuted Contract
REPORT/RECOMMENDATION TO THE BOARD OF SUPERVISORS
OF THE SAN BERNARDINO COUNTY FLOOD CONTROL DISTRICT
AND RECORD OF ACTION

January 5, 2021

FROM
BRENDON BIGGS, Chief Flood Control Engineer, Flood Control District

SUBJECT
Title
Amendment to Local Cooperation Agreement with the United States Army Corps of Engineers, Orange County Flood Control District, and Riverside County Flood Control and Water Conservation District for the Santa Ana River Mainstem Project
End

RECOMMENDATION(S)
Recommendation
Acting as the governing body of the San Bernardino County Flood Control District, approve Amendment No. 1 to Local Cooperation Agreement No. 89-1087 with the United States Army Corps of Engineers, Orange County Flood Control District, and Riverside County Flood Control and Water Conservation District, to revise the project management plan and scope of work descriptions.
(Presenter: David Doublet, Assistant Director, 387-7906)
Body

COUNTY AND CHIEF EXECUTIVE OFFICER GOALS & OBJECTIVES
Ensure Development of a Well-Planned, Balanced, and Sustainable County.
Pursue County Goals and Objectives by Working with Other Agencies.

FINANCIAL IMPACT
Approval of this item will not result in the use of Discretionary General Funding (Net County Cost). The San Bernardino County Flood Control District (District) is funded by property taxes, fees, and other local, state, and federal funding. The action to approve Amendment No. 1 (Amendment) has minimal financial impact. The United States Army Corps of Engineers (Corps) will utilize Bipartisan Budget Act of 2018 funds that are expected to cover 100% of the costs outlined in the proposed Amendment.

BACKGROUND INFORMATION
Major floods in Orange County in 1937 and 1938 prompted Congress to direct the Corps to proceed with design and construction of the Prado Dam, which was completed in 1941. Subsequent studies by the Corps determined that the existing Prado Dam and Santa Ana River improvements only provided a 70-year level of fl...